Compliance Testing and Designated Operator
The crews of the Fleming Environmental, Inc. Environmental Compliance Division will perform the myriad of testing requirements required to keep any facility fully compliant to satisfy the regulatory agencies. The crews maintain and continually are retrained and certified in all aspects of testing set forth by City Fire Departments, County Environmental Health Agencies, Air Quality Agencies, Etc.
UST Designated Operator Monthly Site Inspections:
* Alarm History Review
* Paperwork Inspections
* Paperwork/Compliance Binder Organization and Reporting
* Compliance Inspection (one-hour per month / per facility)
* Reporting to Regulatory Agency
* Report Generation and Submittal to Client
* Sump Inspection (If required)
* Annual Training (concurrent with Monthly site visit)
SB989 (Secondary Containment) Testing:
* Notification to appropriate regulator of date and time of scheduled test.
* Two-man testing crew
* Annular Test
* Secondary Test
* Sump Test
* UDC Test
* Spill Bucket Test
* Test result preparation and submittal to appropriate regulatory agency within the required amount of time.
Vapor Recovery Testing (Phase I EVR Systems):
* Notification to appropriate regulator of date and time of scheduled test.
* TP 201.3 (Pressure Decay Test)
* TP 201.4 (Dynamic back Pressure Test)
* TP 201.6 (Liquid Removal Test – If Needed)
* Test result preparation and submittal to appropriate regulatory agency within the required amount of time.
Vapor Recovery Testing (Phase II EVR Systems):
* Notification to appropriate regulator of date and time of scheduled test.
* TP 201.3 (Pressure Decay Test)
* TP 201.4 (Dynamic back Pressure Test)
* TP 201.1 B (Static Torque Test)
* TP 201.1D (Droptube Test)
* Nozzle Bag Test
* Clean Air Separator and/or Vapor Polisher
* V/L Field Test Data Report
* Test result preparation and submittal to appropriate regulatory agency within the required amount of time.
Annual Monitor System Certification:
* Notification to appropriate regulatory agency/personnel of date and time of scheduled test.
* Inspect panel for proper function
* Remove covers that house sensors
* Test each sensor for proper function at Monitor Panel
* Clean all sensors and ensure proper placement in the sumps
* Install manway screws with anti-seize compound
* Test all line leak detectors
* Attach test verification stickers
* Insure local agency forms are completed
* Test all spill buckets
* Test result preparation and submittal to appropriate regulatory agency within the required amount of time.
Licenses and Certifications
The Key Personnel as well as the Field Lead Technicians at Fleming Environmental, Inc. hold the following licenses and certifications:
* California Contractor’s License Class A & B with a Hazardous Substances Removal and Remedial Actions Certification.
* Franklin Fueling Systems - Automatic Tank Gauge Installation)
* INCON – Sump Test System Operation and Repair
* Fibrelite – Sherlock Vacuum Testing Kit
* ICC – California UST Service Technician
* Blueline Technologies – Equipment Certification
* Environ – GeoFlex System w/Swivel & Coax Fittings Certification
* Healy – Phase II Enhanced Vapor Recovery Equipment License
* SCAQMD – Rule 461 Vapor Recovery Compliance Tester
* Veeder-Root – Underground Storage Tanks Monitoring Systems
* California State Water Resources Control Board – Licensed Tank and Line Integrity Tester
* Universal Sensors and Devices – Leak Alert Monitoring Systems
* Vaporless Manufacturing – Mechanical Line Leak Detectors Certification
* Mine Safety Appliances – Tankguard Series Systems
* Pneumercator – TMS System Trained and Certified
* ICC – California UST Installer and Retrofitter
* ICC – Vapor Recovery System/Parts Installer
* ICC – California UST System Operator
* Estabrooks Ezy Chek Systems – Ezy 3 Locator Plus, Product Line Tester, Leak Detector Tester Equipment Certified
* 40-Hour Hazwoper Certified
* Containment Solutions – Trained Fiberglass Tank Installation Technicians
* Smith Fibercast Total Quality Installation program for the Installation of UL Listed Primary and Secondary Containment Products
* CPR / First Aid Trained
* Confined Space Entry Licensed and Trained
* Ameron International – Proper Installation Procedures for the Dualoy 3000 UL Listed Fiberglass Piping Systems
* OPW – EVR Phase I Trained and Certified
* Franklin Fueling Systems – XP Series Piping Installation Certified
* Bravo Systems Gold Certified Installation and Testing Contractor
* National Utility Contractors Association Competent Person Training Program